Y--Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and Quinn Creek Substation
Issuing Agency:ENERGY, DEPARTMENT OF (Colorado)
Solicitation ID:sam_7579b6a96efe481583168dcc5cef6734
RFP Description
Location: Colorado. NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted. The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and new Quinn Creek Substation projects aim to enhance WAPAs ability to provide reliable and cost-efficient electric power, aligning with WAPAs mission. WAPA benefits from the transmission line upgrades by resolving deteriorating conditions on the existing Glendo Lusk Rural Tap 69kV line. The principal components of work include the following: Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) is proposing to upgrade 35 miles of its Lusk Rural Tap-Glendo (LRT- GLD) 69-kV transmission line to a 115-kV transmission line (Upgrade) in Platte and Niobrara counties, Wyoming and construct a new substation located in Niobrara County, Wyoming. The Upgrade starts at the Glendo Substation (GLD) and runs generally northeast for approximately 25 miles (25.4 miles). A new substation and delivery point named Quinn Creek Substation (QCK) will be constructed in this location. From the QCK Substation, the Upgrade will continue in a northeast direction for approximately 3 miles, it would then run east for approximately 6 miles and terminate at WAPAs Lusk Rural Tap (LRT) just west of the town of Lusk. The Upgrade consists of replacing the LRT-GLD line with a new 115-kV wood pole H-frame transmission line. The new Quinn Creek Substation (QCK), with a 69-kV delivery point, will be constructed on about 5 acres on open rangeland. The Upgrade will be sectionalized into a 25.4-mile-long section called Casper (Pace)-Quinn Creek (CPL-QCK), a 9.4-mile-long Quinn Creek-Lusk Rural Tap (QCK-LRT) will be constructed to 115-kV specifications but operated at 69-kV for the near term. The Upgrade will be constructed on existing ROW, widened by 20 to 25 feet to provide proper clearance for the higher voltage, lengthened spans, and potentially greater blow-out. Location: Platte and Niobrara, 82213, 82227, 82225 Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213 Lusk Rural Tap (LRT) - Latitude: N 42 46' 0"; Longitude: W 104 28' 52"; Datum: NAD83/WGS84 Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo Substation The anticipated period of performance is 800 days calendar days after Notice to Proceed or by December 2028. The estimated magnitude of construction is greater than $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 15 June 2026 at the following sites: https://www.fedconnect.net and https://www.sam.gov. NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material. Please see the link for Construction Change Order Definitization Notices - https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx
How to Win This Contract
This solicitation is set aside for certified Small Businesses (SB/SBE) or Disabled Veteran Business Enterprises (DVBE) in Colorado. Prime contractors bidding must meet specific set-aside quotas or sub out scopes to certified firms to remain responsive. For projects of this size, having clear, compliant documentation and showing immediately available resources to execute the work is the fastest path to selection by ENERGY, DEPARTMENT OF (Colorado). Ensure all bid packages, attachments, and compliance affidavits are completed and uploaded to samgov before the closing deadline on 7/24/2026.
Want to submit a winning proposal for this contract?
Stronger Built's proposal consulting team acts as your in-house bid desk. We parse the statement of work, draft compliant responses, compile set-aside certs, and manage submission. With our Pay-When-You-Win model, you mostly pay us only when your business wins.