WMF Rob Brook Bridge Replacement
Issuing Agency:AGRICULTURE, DEPARTMENT OF - FOREST SERVICE (New Hampshire)
Solicitation ID:sam_066c1108fa8b4e19b3f4c052cc9ac4f9
RFP Description
Location: Campton, New Hampshire. Set-Aside: Total Small Business Set-Aside (FAR 19.5). This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445526Q0070 is issued as a Request for Quotation (RFQ) for WMF Rob Brook Bridge Replacement. PROJECT SUMMARY: The USFS is pursuing a Purchase Order for the reconstruction of Rob Brook Road Bridge on the White Mountain National Forest. Work includes but is not limited to demolition of the existing 28' bridge structure, proper disposal of all materials, and construction of the new 44' bridge. Services shall be performed by the awardee in accordance with the specifications, terms, and conditions of this solicitation, including those found in the solicitation attachments. SET-ASIDE: This solicitation is set aside 100% for Small Business entities under NAICS 237310 - Highway, Street, and Bridge Construction (Size Standard: $45M). PROJECT LOCATION: Saco Ranger District, White Mountain National Forest. See solicitation and its attachments for additional location details. PROJECT MAGNITUDE: between $1,000,000 and $5,000,000 SOLICITATION POINT OF CONTACT: Matthew (Matt) Killian, Contracting Officer matthew.killian@usda.gov PLEASE REVIEW ALL SOLICITATION MATERIALS IN-FULL, INCLUDING ALL INSTRUCTIONS TO OFFERORS, PRIOR TO SUBMITTING A QUOTATION. LATE QUOTATIONS AND/OR QUOTATIONS THAT DO NOT COMPLY WITH SAID INSTRUCTIONS MAY BE DETERMINED NON-REPONSIVE AND ELIMINATED FROM AWARD CONSIDERATION.
How to Win This Contract
This solicitation is set aside for certified Small Businesses (SB/SBE) or Disabled Veteran Business Enterprises (DVBE) in New Hampshire. Prime contractors bidding must meet specific set-aside quotas or sub out scopes to certified firms to remain responsive. For projects of this size, having clear, compliant documentation and showing immediately available resources to execute the work is the fastest path to selection by AGRICULTURE, DEPARTMENT OF - FOREST SERVICE (New Hampshire). Ensure all bid packages, attachments, and compliance affidavits are completed and uploaded to samgov before the closing deadline on 7/1/2026.
Want to submit a winning proposal for this contract?
Stronger Built's proposal consulting team acts as your in-house bid desk. We parse the statement of work, draft compliant responses, compile set-aside certs, and manage submission. With our Pay-When-You-Win model, you mostly pay us only when your business wins.